LV Blvd Ramp

LV Blvd ramp

LV Blvd southbound off- ramp

 Joints are complete on the LV Blvd off-ramp  

Additional drainage

Barrier shift in preparation for LV Blvd ramp closure 

Slip form barrier rail 

Barrier shift preparation 

Bump grinding 

Bump grinding at LV Blvd off-ramp

Replacement of median barrier rail 

Beginning the median barrier rail replacement 

Median Barrier Rail Replacement 

Median Barrier Rail Replacement 

Median Barrier Rail Pour 

Median Barrier Rail Pour 

Marking location for permanent median barrier rail

Preparing to pour concrete for new median barrier rail

Median barrier rail replacement

Median barrier rail replacement

Machine pouring the replacement barrier rail 

Pouring the barrier rail replacement 

Preparing new signage  

Pre-stage overhead signs below the I-515

Pre-stage overhead signs below the I-515 

Slope grading and preparation for concrete valley gutter

Milling the paving transitions

Milling the paving transitions

Paving I-15 ramps to US 95 South

Paving I-15 ramps to US 95 South

Paving I-515 at US 95 South

Paving I-515 at US 95 South

Paving at I-515 and Casino Center Boulevard 

Ramp transition grind

Eastern Avenue Bridge Demo & Reconstruction

Desert Inn Bridge Demo & Reconstruction

November 2021

South half of the new I-515/Eastern Ave bridge deck

Preparing for pavement near the new drainage improvements on the Eastern Ave offramp

Three out of six large, steel beams placed for reconstruction of the south half of the I-515/Eastern Ave bridge

Drainage improvements on the Eastern Ave offramp to help collect water runoff and protect the roadway

Second steel beam being placed for reconstruction of the Desert Inn bridge

Eastern Avenue deck rebar being placed

Placing polymer (poly) overlay on I-515 near the Casino Center offramp 

Poly overlay helps protect roadway surfaces from tire wear and can easily be removed and replaced

Poly overlay continues on I-515 near the Casino Center ramp

Poly overlay continues on I-515 near the Casino Center ramp

Pan decking (metal floor decking) at the Desert Inn bridge

Wet cure blankets on Eastern Ave bridge deck

October 2021

Storm drain being installed on southbound I-515 at the Eastern offramp 

Traffic shift on I-515 near Desert Inn, in preparation for bridge demo starting Oct. 25

I-515 bridge near Desert Inn prepped for demo

Demolition of the east half of the I-515/Eastern Ave bridge

Repairs to the Las Vegas Blvd on-ramp to I-515 (US 95) NB

September 2021

Desert Inn

Crews work to reconstruct a portion of the I-515 bridge deck over Desert Inn Rd.

I-515 Overnight

NDOT shifted barrier rail, changed striping, and closed the Casino Center on-ramp to I-515 NB overnight on 9/23.

I-515 NB Shift

The I-515 NB lanes have been shifted to the center of the deck north of Las Vegas Blvd so crews can continue viaduct repair work.